CTI 9600 - SERVICE
Call for Price

Consumable parts vary with model type. Pricing is determined by model configuration, oil type and hard parts damage.
Brooks CTI-Cryogenics 9600 - Scope of Work
One year warranty service.
PTB Sales will perform the following:
1. Incoming Inspection
- Attach work order to 9600 compressor
- Picture taken of 9600 compressor’s configuration / condition
- Record static charge pressure
- Record hours and last date serviced
2. Record current (Amps) on all three input phases
3. Record inlet / outlet water temperature
4. Complete teardown and disassembly of the compressor
5. All parts are inspected and cleaned with a high pressure parts washer
- Flush heater exchanger
- Paint exterior panels
6. 9600 Compressor Rebuild
- Pump motor
- Measure / record resistance on all three phases
- Replace pump motor if current and / or resistance is out of spec
- Replaced hour meter
- Rebuild by-pass valve
- Clean / inspect replace O-rings
- Rebuild dump valve
- Clean / inspect and replace O-rings
- Rebuild oil mist section
- Clean / inspect Orifice and replace O-rings
- Clean / inspect and / or replace filters
- Rebuild oil injection section
- Clean / inspect oil inject valve and replace O-rings
- Replace oil injection filter
- Rebuild pressure gauge
- Clean / inspect pressure gauge and replace O-ring
- Replace pressure relief valve
- Clean / inspect casters
- Replace helium adsorber
- Replace aeroquip fittings and O-rings
- Helium supply and return fittings
- Oil pump fill and drain fittings
- Helium charge fitting
- Water connection fittings
- Clean / inspect and / or replace water inlet connector
- Clean / inspect and / or replace water outlet connector
7. Electrical Chassis Rebuild
- Verify 2 phase and 3 phase coldhead output power
- Inspect / replace PCB's
- Inspect / replace power components > 5 years old
- Inspect / replace I/O connectors (On-Board output and remote)
- Inspect / replace circuit breakers (main and control) and contactors
- Verify On-Board output power
8. Rough evacuation helium and oil ports for 8 hours
9. Helium charge to specified static charge pressure
10. Final Test
- Install panels
- Helium circuit leaked checked to 1 x 10E-7 sccm
- Load test
- Record compressor input current on all 3 phases
- Record compressor inlet / outlet water temperature
- Record cryopump’s bottom out times
- Record cryopump’s bottom out temperatures
11. Final Quality Control Check List
- Final test report attached to compressor
- Replace service label with hours recorded at time of service
- Protective caps installed on supply / return fittings
- Protective covers installed on power and remote connectors
- Package in accordance with DOT Standards
This product has been refurbished by PTB Sales, Inc. PTB Sales is not affiliated with Brooks Automation, Inc., the Original Equipment Manufacturer. In some cases, PTB Sales uses processes and parts that are different from those used by the OEM, and the OEM expressly disclaims any warranty obligations with respect to this refurbished product.