Edwards QDP40 / QMB250 - SERVICE
Call for Price
In stock
SKU
SERVICE_QDP40/QMB250

Consumable parts vary with model type. Pricing is determined by model configuration, oil type and hard parts damage.
Edwards QDP40 / QMB250 - Scope of Work
PTB Sales will perform the following:
1. Complete teardown and disassembly of the pump
2. All parts are inspected and cleaned
- High pressure parts washer
- Corncobb blaster
- Glass blaster
3. Parts are dimensionally evaluated
4. Rebuild of the pump (All OEM parts used)
- Exhaust silencer
- NEW O-rings/seals installed
- Claws/spacer sleeves
- recoated with Teflon
- Exhaust check valve
- NEW O-rings installed
- TCV water valve
- TCV water manifold
- NEW O-rings/seals installed
- Pump module
- Headplates, stators and shafts stoned
- NEW pump bearings installed
- NEW gas ballast valve installed
- NEW 3 to 4 interstage valve installed
- NEW Oil sight glass installed
- All O-Rings, seals, rings filters, shims and gaskets replaced with NEW
- Module painted
- Motor
- NEW motor bearings installed
- NEW motor gaskets installed
- NEW coupling (spider) installed
- NEW Rotation/Motor Rating label applied
- Shaft keys replaced with new
- Painted
5. Final Tests
- iQDP electronic module tested with Edwards Software laptop/Pump Display Module (GameBoy)
- iQDP electronic module fuses checked/replaced as necessary
- Water flow switches operation confirmed/tested
- Sensor module and wiring checked
- Hour counters zeroed
- Sensors zeroed
- Base pressure tested
- Gas ballast off
- Gas ballast on
- Motor amperage confirmed
- Noise/db level confirmed
- 24 hour run test
- All switches/sensors readings confirmed
6. Packaging and Shipping
- Paint pump
- Apply all safety and startup labels
- Test reported completed
- QC report created
- Package pump and ship